DOWNLOAD THE PDF VERSION OF THIS CASE STUDY
Greif Omaha, Nebraska: Multiwall Packaging Facility
Getting to the Bottom of a Speed Loss Issue
At Greif’s Omaha, Nebraska Multiwall Packaging facility, management was working on improving OEE by focusing their efforts on their perceived speed loss issues. After installing Plantnode, the data collected revealed that the line was actually running at higher than expected speeds but the plant was losing on downtime with their paper roll changes during shift. According to Greif’s manual data, roll changes averaged two minutes, but Plantnode data showed that each roll change actually lasted from three to fifteen minutes per shift. After pinpointing the problem, Omaha nailed down the average roll change to two minutes.
Plantnode also detected registration problems with the plant’s Pinchbottom machine, which seals bags. The registration problems totalled 140 per shift, lasting 30 seconds each, which added up to a significant loss of time. With the installation of Plantnode Enterprise, the plant has eliminated 112 hours per month of downtime and realized $80,000 of annual labour savings.
Greif Gent, Belgium: Steel Drum Plant
Belgium Plant Uncovers Sensor Issues Contributing to Speed Loss
At Greif’s Gent, Belgium plant, managers couldn’t understand why their production of 50-gallon drums was falling short of the standard level of 720 drums per hour. Plantnode data showed that a simple sensor loading lids onto the drums was preventing the lids from going into the line and responsible for a 6.6% speed loss. By resolving the sensor problem, the plant increased their speed immediately, eliminating the speed loss and increasing production to 725 drums per hour.
Greif Sao Paolo, Brazil: Steel & Plastic Drum Plant
Greif Brazil Plugs the Leak on Minor Stoppages
Greif’s Sao Paolo Brazil plant also yielded immediate results and return on investment (ROI) after Plantnode was implemented. A number of small minor stoppages were identified that had previously gone undetected. Within one month of installation, OEE improved by 6% on the drum line and 3.5% on the plastic drum line and output increased from 293 to 309 units per hour. As a result, annual labour savings at the Sao Paolo plant totalled $115,000USD.
Greif has experienced the value of using Plantnode Enterprise to help them isolate problems, set new targets and measure performance to drive further continuous improvement.
Greif Deploys Plantnode Enterprise across 90 Plants and 20 Countries
Greif is now deploying Plantnode Enterprise company-wide in 90 plants across 20 countries. Plantnode Enterprise collects real-time data across multiple lines, plants and geographies, enabling standardization and comparison of efficiencies from job to job, plant to plant or employee to employee.
“We wanted to take our operational efficiency to the next level,” says Travis Groff, vice president of OpEx Worldwide, Greif (www.greif.com). “Our current manual method of driving improvement didn’t provide visibility into all losses of efficiency but Plantnode Enterprise provides an unbiased way to measure effectiveness and capacity planning across our entire network of plants.” Using the Shoplogix solution, the company has already seen a significant improvement in OEE (Overall Equipment Effectiveness) and increased run speed at a number of its plants.